首页> 美国政府科技报告 >Geophysical study of the Building 103 Dump, Aberdeen Proving Ground
【24h】

Geophysical study of the Building 103 Dump, Aberdeen Proving Ground

机译:建筑物103倾倒,aberdeen试验场的地球物理研究

获取原文

摘要

The Building 103 Dump is one of ten potentially contaminated sites in the Canal Creek and Westwood areas of the Edgewood section of Aberdeen Proving Ground examined by a geophysical team from Argonne National Laboratory in April and May of 1992. Noninvasive geophysical surveys, including magnetics, resistivity, ground-penetrating radar, and seismic refraction, were conducted. These surveys indicate that much of the area is free of debris. However, prominent magnetic and resistivity anomalies occur along well-defined lineaments, suggestive of a dendritic stream pattern. Prior to the onset of dumping, the site was described as a ''sand pit,'' which suggests that headward erosion of Canal Creek tributaries cut into the surficial aquifer. Contaminants dumped into the landfill would have direct access to the surficial aquifer and thus to Canal Creek. Seismic refraction profiling indicates 6--12 ft of fill material now rests on the former land surface. Only the northern third of the former landfill was geophysically surveyed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号