首页> 美国政府科技报告 >Conceptual framework for using DOE 5700.6C and the other DOE orders as an integrated management system; the Fermilab experience
【24h】

Conceptual framework for using DOE 5700.6C and the other DOE orders as an integrated management system; the Fermilab experience

机译:使用DOE 5700.6C和其他DOE订单作为综合管理系统的概念框架;费米实验室的经验

获取原文

摘要

In this paper, I describe a conceptual framework that uses DOE Order 5700.6C and more than 140 other DOE Orders as an integrated management system -- but I describe it within the context of the broader sociological and cultural issues of doing research at DOE funded facilities. The conceptual framework has two components. The first involves an interpretation of the 10 criteria of DOE 5700.6C that is tailored for a research environment. The second component involves using the 10 criteria as functional categories that orchestrate and integrate the other DOE Orders into a total management system. The Fermilab approach aims at reducing (or eliminating) the redundancy and overlap within the DOE Orders system at the contractor level.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号