Persistence of the impact of the Hood River Conservation Project on typical and peak loads three years after weatherization.

机译:在风化后三年,胡德河保护项目对典型和高峰负荷的影响持续存在。

获取原文

摘要

The Hood River Conservation Project (HRCP) was a major residential retrofit demonstration project, operated by Pacific Power & Light Company (Pacific Power) between 1984 and 1988, and funded by the Bonneville Power Administration (Bonneville). The project ...