首页> 美国政府科技报告 >Environmental implementation plan: Chapter 16, Environmental appraisal and surveillance program. Draft revision
【24h】

Environmental implementation plan: Chapter 16, Environmental appraisal and surveillance program. Draft revision

机译:环境实施计划:第16章,环境评估和监督计划。修订草案

获取原文

摘要

The Savannah River Site (SRS) environmental-appraisal/surveillance program is designed to monitor environmental performance and to ensure that regulatory requirements are met. The appraisal /surveillance program is a two-tiered system which consists of external and internal appraisals and surveillances. External appraisals/surveillances are conducted by organizations not reporting to SRS management. The internal appraisals/surveillances are conducted by site organizations referred to as organizations. External appraisals include Environmental Protection Agency (EPA) and South Carolina Department of Health and Environmental Control (SCDHEC) regulatory appraisals, DOE-SR and DOE-HQ appraisals, and operating contractor reviews. These appraisals are the result of regulatory requirements, DOE orders, or operating contractor policies. The Environmental Protection Department (EPD) leads the coordination, planning, and scheduling support. The internal appraisal program consists of three types; management appraisals, program appraisals, and facility appraisals. All organizations developed and implemented a formal facility-appraisal program in February 1989. The first facility appraisal was completed during FY 89. To ensure consistency between departments, the SRS environmental appraisal procedure was completed in December 1988. EPD conducts both the management and program appraisals.

著录项

  • 作者

    Amobi, C;

  • 作者单位
  • 年度 1993
  • 页码 1-23
  • 总页数 23
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

    EDB/290300;

    机译:EDB / 290300;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号