首页> 美国政府科技报告 >Fort Gordon Energy Survey Analysis of Boiler and Chiller Plants, Building 25910and Building 25330. Proposed Energy Conservation Opportunities for Savannah District Corps of Engineers. Volume 1 of 3
【24h】

Fort Gordon Energy Survey Analysis of Boiler and Chiller Plants, Building 25910and Building 25330. Proposed Energy Conservation Opportunities for Savannah District Corps of Engineers. Volume 1 of 3

机译:Fort Gordon能源调查分析锅炉和冷水机组,建设25910和建筑物25330.萨凡纳地区工程兵团提出的节能机会。第1卷,共3卷

获取原文

摘要

Project No. 1 is all of the recommended ECO's combined for the chilled watersystem in the North area, which is controlled and supplied from Building 25910. The attached project drawing shows an upgrade and general layout of equipment, showing the reuse of the existing cooling towers with new piping from them which will go through a free cooling heat exchanger. There will be pumps at each chiller that will extract the required amount of cooling water through a loop piping arrangement. Chillers 5, 6, and 7 are existing, but new higher efficiency chillers will be added in the size range of one 400 ton and two of 1,250 ton chillers. Return chilled water will either be run in a loop that will feed any of the chillers which have its new pump 'on' to circulate the chilled water through it, or if no pumps are 'on', the water will circulate through the new free cooling plate heat exchanger to be located in Building 25910. Teed off of the return chilled water system there will be a pipe that feeds a chilled water storage tank which will be located behind the Plant in the woods. There will be a pump parallel with that line so that if additional pressure is needed to get the water up to the top of the storage tank, that pump will come on. The water in that pipe and water in the pipe leaving at the bottom of the chilled water storage will go back to the Plant. Both of these pipes will have flow in either direction, depending on whether the storage tank is being charged as it will be at night in the summer time, or whether it is being discharged during the peak cooling hours during the day in the summer. The existing chilled water distribution pumps will remain in operation, but the drives will now be controlled by a single variable speed drive.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号