首页> 美国政府科技报告 >Central Heating Plant Modernization Study for Defense Distribution Region East
【24h】

Central Heating Plant Modernization Study for Defense Distribution Region East

机译:国防集散区东部集中供热厂现代化研究

获取原文

摘要

Due to the age of its central heating plant (CHP) equipment and changes in energyindustry environmental regulations, the Defense Distribution Region East (DDRE), New Cumberland, PA, began investigating modernization opportunities for its CHP. The U.S. Army Construction Engineering Research Laboratories (USACERL) was tasked with performing a central heating plant modernization study to determine viable options to provide energy for the coming years. Energy use patterns and the condition of existing equipment were determined, and five major potential energy supply alternatives were identified and evaluated on the basis of energy consumption and economics, including initial capital costs, annual fuel consumption, and annual Operations and Maintenance (OM) costs. For economy, it was recommended that boiler replacement be delayed until the year 2009, and that natural gas be used as fuel both before and after replacement, provided that funding for a natural gas pipeline can be obtained. If funding to replace the boilers does become available, the small difference in Life Cycle Cost should not delay DDRE from an immediate equipment upgrade.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号