首页> 美国政府科技报告 >Time as an Independent Variable: A Tool to Drive Cost Out of and Efficiency into Major Acquisition Programs.
【24h】

Time as an Independent Variable: A Tool to Drive Cost Out of and Efficiency into Major Acquisition Programs.

机译:时间作为一个独立变量:一个驱动成本和主要收购计划效率的工具。

获取原文

摘要

With few exceptions, studies on improving the acquisition of weapon systems and services within the DoD observe that the process takes too long. A 2010 report of a study led by former Secretary of Defense William Perry and former Assistant to the President for National Security Affairs Stephen Hadley entitled The QDR in Perspective: Meeting America s National Security Needs in the 21st Century: The Final Report of the Quadrennial Defense Review Independent Panel supported this point of view, asserting that no defense program should exceed seven years. In a September 14, 2010, memorandum, the Under Secretary of Defense for Acquisition, Technology, and Logistics called for the DoD acquisition community to set shorter program timelines and manage to them. But what is the right timeline for a given defense program. The author offers a methodology for making that determination through a process using time as an independent variable (TAIV )1 in a way similar to using cost as an independent variable (CAIV). Using TAIV establishes a credible way of reconciling cost, capability, and the time required to field a needed capability.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号