首页> 美国政府科技报告 >Evaluation of the Goal System (trademark) Version 2.2 Solution Method forInteractive Constraint Scheduling Situations
【24h】

Evaluation of the Goal System (trademark) Version 2.2 Solution Method forInteractive Constraint Scheduling Situations

机译:目标系统(商标)版本2.2的评估交互式约束调度情况的解决方法

获取原文

摘要

THE GOAL SYSTEM version 2.2 is the latest in a lineage that includes OptimizedProduction Technology (OPT) and DISASTER. Earlier work with DISASTER revealed potential shortcomings with sequential schedule building algorithms when multiple interactive constraints exist. Since THE GOAL SYSTEM version 2.2 has a capacity for simultaneous schedule building, this study evaluated differences between the two algorithms. Using benchmark scheduling problems developed during the earlier evaluation of DISASTER, a set of THE GOAL SYSTEM solutions was created and compared quantitatively to both DlSASTER solutions and solutions which optimally minimize maximum tardiness. A broad set of performance measurement criteria were also used to obtain a more comprehensive evaluation of the solutions. Performance of THE GOAL SYSTEM was quite good with respect to maximum tardiness. Performance with respect to average flow time, percentage of tardy jobs, and total days late for a set of job orders was markedly poorer than the DISASTER solutions. The results were unexpected, since the simultaneous scheduling algorithm is less restricted in its options for schedule creation. The author concluded that the simultaneous feature of THE GOAL SYSTEM was better suited for conflict resolution during an iterative process than as a stand alone scheduling algorithm.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号