首页> 美国政府科技报告 >Construction Productivity Advancement Research (CPAR) Program. An ImprovedBuilding Energy Performance Commissioning Process Based on Short-Term Testing
【24h】

Construction Productivity Advancement Research (CPAR) Program. An ImprovedBuilding Energy Performance Commissioning Process Based on Short-Term Testing

机译:建筑生产力进步研究(CpaR)计划。基于短期测试的改进建筑能效调试过程

获取原文

摘要

As buildings become more complex or take on new functions, new operationalproblems tend to surface. These include excessive energy costs, malfunctioning mechanical equipment, and uncomfortable working conditions. Energy-related problems often can be identified and documented for correction through the process called commissioning. Commissioning could have a major positive impact on institutional energy bills and occupant comfort, but the procedures currently available are not standardized and are variously flawed. Problems include limited scope and quality control of inputs to building design model, need for inconveniently long-term energy flow data, and failure to provide substantial diagnostic information to correct problems. As part of the Army Corps of Engineers Construction Productivity Advancement Research (CPAR) Program, the U.S. Army Construction Engineering Research Laboratories (USACERL) and Colorado State University developed and demonstrated an inexpensive commissioning procedure based on short-term energy monitoring and performance testing. This commissioning procedure was field-tested on commercial-scale buildings of various design and locale. The procedure successfully revealed defects in the design, construction, or operations of each building tested.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号