首页> 美国政府科技报告 >9-Foot Navigation Channel Project; Channel Maintenance Management Plan, UpperMississippi River, Head of Navigation to Guttenberg, Iowa, Volume 2
【24h】

9-Foot Navigation Channel Project; Channel Maintenance Management Plan, UpperMississippi River, Head of Navigation to Guttenberg, Iowa, Volume 2

机译:9英尺导航通道项目;通道维护管理计划,Uppermississippi River,导航头向爱荷华州Guttenberg,第2卷

获取原文

摘要

The purpose of this Environmental Impact Statement is to analyze theenvironmental impacts of actions proposed in the Channel Maintenance Management Plan (CMMP) for maintaining a 9-foot navigation channel, along with commercial and small-boat harbors, on the Upper Mississippi River between Guttenberg, Iowa and the head of navigation at Minneapolis, Minnesota. The proposed actions analyzed in this document include dredging; dredged material placement; recreational beach maintenance and development; repair, construction, modification, and/or removal of channel structures; clearing and snagging operations; and future site planning for dredged material placement. Site specific social and economic effects of the CMMP range from slightly negative effects to significantly positive effects.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号