Operation and Maintenance Manual, Record Drawings, and Summary of Initial Results for the Expanded Bioventing System Installed at Site SS-41 (Former Fuel Pumping Station Number 3), Charleston AFB, SC

机译:ss-41(前燃料泵站3号)安装的扩展生物通风系统的操作和维护手册,记录图和初步结果摘要,查尔斯顿空军基地,南卡罗来纳州

获取原文

摘要

This letter transmits three copies of the Operation and Maintenance (O&M) Manual prepared for the expanded bioventing system recently installed at Site SS-4l (Former Fuel Pumping Station No. 3, Building 93), Charleston Air Force Base (AFB), South Carolina. Appendix A of the O&M Manual contains record drawings for the installed system. This letter report also provides a summary of the work performed by Parsons Engineering Science, Inc. (Parsons ES) at the site from February through June 1997. Included in this report are the initial bioventing system operating parameters and sampling results. Copies of this letter and the O&M Manual also have been sent to Mr. Al Urrutia, the point of contact at Charleston AFB.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号