首页> 美国政府科技报告 >Engineering Evaluation/Cost Analysis for the Risk-Based Remediation of Pumphouse Number 2
【24h】

Engineering Evaluation/Cost Analysis for the Risk-Based Remediation of Pumphouse Number 2

机译:第2号泵房基于风险的修复工程评估/成本分析

获取原文

摘要

Parsons Engineering Science, Inc. (Parsons ES), formerly Engineering- Science, Inc. (ES), was retained by the United States (US) Air Force Center for Environmental Excellence (AFCEE) to prepare an engineering evaluation/cost analysis (EE/CA) in support of a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Pumphouse Number 2, a former fuel storage and pumping facility at Malmstrom Air Force Base (AFB), in Great Falls, Montana (the Base). Risk-based remediation is designed to combine natural physical, chemical, and biological processes with low-cost source removal technologies such as in situ bioventing, as necessary, to economically reduce potential risks posed by subsurface petroleum fuel spills. A decision diagram for the risk-based process is shown in Figure 1.1.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号