首页> 美国政府科技报告 >Technical Test Plan for Aircraft 85-0085 Intermittent Power Failure AnomalyFlight
【24h】

Technical Test Plan for Aircraft 85-0085 Intermittent Power Failure AnomalyFlight

机译:飞机技术试验计划85-0085间歇性停电异常飞行

获取原文

摘要

B-1B aircraft 85-0085 arrived 29 Jul 96 for PDM. Aircraft experiencedintermittent electrical failures during Functional Check Flight (FCF) on 27 Nov 96. Troubleshot defect and conducted Operational Check Flight (OCF) on 7 Dec 96. Intermittent failure reoccurred during flight. Extensive troubleshooting identified several defective electrical power components which feasibly could have caused the in-flight failure. These components were removed and replaced. Detailed troubleshooting background is included. An OCF is scheduled for 10 Jan 97, weather permitting, with FCF to follow 11 Jan 97. After successful FCF, delivery is scheduled for 22 Jan 97.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号