首页> 美国政府科技报告 >Environmental Assessment: MWR Marina Renovation at Seaplane Base, NASWI
【24h】

Environmental Assessment: MWR Marina Renovation at Seaplane Base, NASWI

机译:环境评估:NasWI水上飞机基地的mWR码头改造

获取原文

摘要

The Department of the Navy (Navy) has prepared this Environmental Assessment (EA)to evaluate the potential environmental effects associated with the renovation of the existing Morale, Welfare, and Recreation (MWR) Department Marina at Seaplane Base, Naval Air Station, Whidbey Island (NASWI), Island County, Washington. Renovation would include demolition of an old, 'L'-shaped, wooden boat house (Building 19) at the MWR Marina in Crescent Harbor. In its place, the Navy would develop an expanded uncovered marina capable of serving 60 boats. Principal areas of concern addressed in this EA include potential effects to historical resources, water quality, and wildlife and fishery resources. Based on the analysis in this EA, a Finding of No Significant Impact (FONSI) is recommended and the preparation of an Environmental Impact Study (EIS) is not required.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号