首页> 美国政府科技报告 >Joint Modeling and Simulation System (JMASS), Joint Initial Requirements Document(JIRD)
【24h】

Joint Modeling and Simulation System (JMASS), Joint Initial Requirements Document(JIRD)

机译:联合建模与仿真系统(Jmass),联合初始要求文件(JIRD)

获取原文

摘要

The Joint Modeling and Simulation System (JMASS) requirements will evolve throughmultiple stages. The purpose of this document is to define the initial overall programmatic requirements, high level capabilities, operation and support requirements for JMASS. Pilot projects will be used to refine and further specify the requirements in this document. Implementation of the specific requirements will be accomplished by a Program Office. JMASS is designed to support acquisition as defined in the Department of Defense (DoD) Regulation 500O.2-R. JMASS provides a software architecture for the development of models, configuration of models into simulations, execution of simulations, and post processing of data obtained from the simulation. The JMASS software facilitates interoperability with other simulations in accordance with DoD accepted standards. Additionally, it defines and implements a set of standards and documentation for JMASS compliant models. It provides tools that assist in the development and application of reusable models and model components. Standards defined and implemented by JMASS shall include: (1) Guidelines for the development of JMASS compliant models and documentation. These guidelines are called the Software Structural Model (SSM); (2) Tools to implement the SSM; (3) Model-to-model and model-to-system interfaces; (4) Tool-to-system interfaces; (5) Guidelines and tools for porting legacy models to JMASS; and (6) Man machine interface modeling.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号