首页> 美国政府科技报告 >Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit Three
【24h】

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Focused Feasibility Study for Operable Unit Three

机译:伍德布里奇研究设施补救调查/可行性研究;可操作单元三的可行性研究

获取原文

摘要

Operable Unit 3 (OU3) at the Woodbridge Research Facility (WRF) has been defined as the Main Ditch (AREE 22) and the area between the northern boundary of the Main Compound and the Main Ditch (portions of AREEs 11 and 17). This report summarizes the site history, current conditions, and environmental data associated with OU3. Human Health and Ecological Risk assessments are presented. General response actions, technology types, and process options appropriate for the remediation of sediment are identified as well as proposed elements for the implementation of institutional controls for the OU. Process options are screened and assembled into six alternatives. Each alternative is evaluated in detail using the nine criteria identified in the NCP (40 CFR 300. 430(e)). The report concludes with a comparison of the remedial options under consideration.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号