首页> 美国政府科技报告 >Notice of Preparation of an Environmental Impact Report for the Joint IntermodalTerminal Project Oakland, Alameda County, California
【24h】

Notice of Preparation of an Environmental Impact Report for the Joint IntermodalTerminal Project Oakland, Alameda County, California

机译:关于为加利福尼亚州阿拉米达县奥克兰联合多式联运终端项目编写环境影响报告的通知

获取原文

摘要

The project is located within the northwestern portion of the City of Oakland inAlameda County along the eastern shore of San Francisco Bay. The site is situated in the northern portion of the area within the boundaries of the Navy's former FISCO facility. The project consists of raising the current ground elevation (grade) and repaving the site for the development of eight rail lines (approximately 45,000 feet of loading and storage track), and associated entrance gate, administrative and maintenance structures and installation of new utility systems. The railyard will be configured to allow for main track entrance and exit connections to the existing Union Pacific/Southern Pacific main rail lines. The terminal will be designed to provide trailer-on-flat-car, container-on-flat-car, and double-stack transfer services. The project will include areas for container storage and truck parking and the configuration of new roadway access. The project will be constructed in several phases as needed to accommodate the growth of the intermodal cargo market and augment the throughput capacities of the neighboring UP/SP rail yard. The first phase consists of the construction of approximately 9000 feet of track to facilitate the integration of the Burlington Northern/Santa Fe railway into the Port's intermodal cargo distribution system. This phase is expected to begin construction in 1999.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号