首页> 美国政府科技报告 >Allocation of Navy Real Property Maintenance Funding
【24h】

Allocation of Navy Real Property Maintenance Funding

机译:海军房地产维修资金的分配

获取原文

摘要

The Office of the Chief of Naval Operations (OPNAV) allocates roughly $9OOmillion annually from its operations and maintenance (OM) appropriation for facilities maintenance and repair. Annual reports of facility condition, plant value, and maintenance and repair costs provide the basis for apportionment of these funds to each of 15 major Naval organizations (major claimants). Funding shortfalls have contributed to a chronic deferral of maintenance and repair projects. The resulting backlog of critical unfunded requirements for facilities maintained by the OM appropriation totaled $2 billion at the end of fiscal year 1995. OPNAV's objective is to stabilize or reduce this backlog over time while providing maintenance and repair funding for the major claimants consistent with readiness objectives. This thesis develops a multiobjective, infinite horizon linear program to determine multi-year maintenance and repair funding levels for the major claimants while adhering to annual budget constraints and a standard Navy facility priority system linked to operational readiness. The model produces funding recommendations that are managerially and administratively feasible, and it shows an improved capacity to apportion funding consistently with the existing priority system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号