首页> 美国政府科技报告 >Operations and Maintenance Manual for Expanded Bioventing System, Site SS-41, Former Building Number 93 (Fuel Pumping Station Number 3), Charleston Air Force Base, Charleston, South Carolina
【24h】

Operations and Maintenance Manual for Expanded Bioventing System, Site SS-41, Former Building Number 93 (Fuel Pumping Station Number 3), Charleston Air Force Base, Charleston, South Carolina

机译:扩建生物通风系统操作和维护手册,ss-41站点,前建筑物编号93(燃料泵站3号),查尔斯顿空军基地,南卡罗来纳州查尔斯顿

获取原文

摘要

This Operations and Maintenance (O&M) Manual has been created as a guide for monitoring and maintaining the performance of the expanded bioventing blower systems and vent well plumbing at Site SS-41 (Former Building No. 93 Fuel Pumping Station 3), Charleston AFB, South Carolina. Record drawings of the expanded bioventing system installed at Site SS-41 are provided in Appendix A.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号