首页> 美国政府科技报告 >Cost-Benefit Analysis of Earned Value Management System Criteria
【24h】

Cost-Benefit Analysis of Earned Value Management System Criteria

机译:挣值管理制度标准的成本 - 收益分析

获取原文

摘要

In December 1996, the Cost/Schedule Control Systems Criteria (C/SCSC) wasofficially replaced by the Earned Value Management Systems (EVMS) criteria. The switch to EVMS, coupled with current acquisition reform changes, have left many wondering what the effects of these changes will be. This thesis defines the costs and benefits of the old C/SCSC, and then compares them. Additionally, this thesis discusses the changes accompanying the switch to EVMS and the effect on the costs and benefits. The marginal costs of C/SCSC are defined as the difference between the costs of a C/SCSC compliant system and a contractors normal management control system. The marginal system compliance costs are 334-481 person days, while the marginal operating costs are 50% of the C/SCSC compliant operating costs. Fourteen benefits of C/SCSC are detailed in this thesis. The most important benefit discovered was the data reliability that comes with a criteria compliant management control system. The main difference between C/SCSC and EVMS is the system certification process. Under C/SCSC, DoD teams would have to certify a contractor's system. Under EVMS, contractors have the ability to self-certify their system (with final government approval). Cost savings may result through self-certification without reductions in the benefits.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号