首页> 美国政府科技报告 >Value of Increased Use of Scheduled Maintenance on Aircraft Availability and Maintenance Cost of the C-5
【24h】

Value of Increased Use of Scheduled Maintenance on Aircraft Availability and Maintenance Cost of the C-5

机译:增加使用定期维护对C-5飞机可用性和维护成本的价值

获取原文

摘要

The C-5 consistently performs below its established mission capable rate of 75 percent. The purpose of this study was to investigate whether or not mission capable rates and maintenance costs can be improved by increased use of scheduled maintenance. Nine C-5 components were studied. Availability and cost were compared when scheduled replacement occurred at ten, twenty, and thirty percent before their respective mean time between failure and actual failure times. Actual failure times were not available so they were generated using simulation. The trade off of using preventive maintenance is the decreased cost of sending fewer maintenance repair teams and increased C-5 availability, versus the increased cost of early component replacement. This study's findings suggest that the level of variance in the failure distribution of components will have an influence on the effectiveness of a preventive maintenance program. The use of preventive maintenance on components with a high variance in the failure distribution appears to have a negative effect on availability at a higher cost than with not using preventive maintenance. The use of preventive maintenance on components with a moderate or small amount of variance in its failure distribution appears to be effective up to a point of diminishing return.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号