首页> 美国政府科技报告 >Comparison of Project Delivery Systems on United States Federal Construction Projects
【24h】

Comparison of Project Delivery Systems on United States Federal Construction Projects

机译:美国联邦建设项目项目交付系统比较

获取原文

摘要

Previous subjective research identified shortened project duration as the primary reason for public owners' selection of design-build for project delivery. This study presents specific comparisons of the design-bid-build and design-build delivery systems to objectively inform federal project owners of actual project performance. The United States Federal Construction Program, deeply rooted in traditional design-bid-build project delivery, has attempted to a limited degree to deliver projects via the design-build delivery system to better meet project cost, schedule and quality goals. This research first analyzed 273 completed private, public and federal construction projects to provide direct, objective comparison of cost, schedule and quality performance between design-bid-build and design-build project delivery systems. An in-depth investigation was then conducted on the 88 federal construction projects to compare projects by delivery system based on equivalent project delivery system start at zero percent design complete.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号