首页> 美国政府科技报告 >United States Coast Guard Integrated Risk Assessment Process. Volume 2. Coarse Hazard Analysis of a WMEC-210 Vessel in Support of the Paragon Project and Coarse Hazard Analysis of the Integrated Support Command (ISC) at Seattle, WA
【24h】

United States Coast Guard Integrated Risk Assessment Process. Volume 2. Coarse Hazard Analysis of a WMEC-210 Vessel in Support of the Paragon Project and Coarse Hazard Analysis of the Integrated Support Command (ISC) at Seattle, WA

机译:美国海岸警卫队综合风险评估程序。第2卷。支持paragon项目的WmEC-210船只的粗略危险分析以及华盛顿州西雅图综合支援司令部(IsC)的粗略危险分析

获取原文

摘要

Due to the new challenges (e.g., government downsizing, increased system complexity, ever changing high risk operations) faced by the Coast Guard, the Coast Guard Research and Development Center (RDC) was requested to explore the possibility of applying system safety concepts, including the use of risk analysis and enhancement of inspection procedures, to improve Coast Guard operations and facility safety. The Coast Guard RDC teamed with JBF Associates, Inc. (JBFA), a consulting firm specializing in hazard and risk analysis/ management, to develop a risk based loss prevention program. The initial focus was on developing one portion of the risk based loss prevention program, a risk assessment process. This report discusses the development, validation, and end product (the Integrated Risk Assessment IRA process) of this effort. Effective implementation of the IRA process provides the Coast Guard with risk based information for: (1) controlling and reducing loss exposure, (2) making risk based decisions, and (3) using limited resources more efficiently. The IRA process proved to be an effective and efficient risk assessment tool for various types of vessels and their operations, as well as shore facilities and their operations.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号