Work Plan for the Demonstration of Phytostabilization of Chlorinated Solvents from Groundwater at Site 17, Altus Air Force Base, Oklahoma. Draft.

机译:俄克拉荷马州阿尔特斯空军基地17号地下水中氯化溶剂植物稳定化示范工作计划。草案。

获取原文

摘要

This work plan was prepared by Parsons Engineering Science, Inc. (Parsons ES) for the Air Force Center for Environmental Excellence (AFCEE) as part of an overall demonstration of engineered tree plantings to hydraulically control (phytostabilize) groundwater contaminated with chlorinated aliphatic hydrocarbons (CAHs). The activities outlined in this work plan will be performed at Altus Air Force Base (AFB), Oklahoma. Two primary objectives exist for this project: 1) Demonstrate the ability or inability of engineered tree plantings to hydraulically control groundwater through field measurements; and 2) Utilizing the field measurements, refine and calibrate a water balance model to be used as a screening and evaluation tool for phytostabilization at other Air Force sites (to be completed by others). These two objectives provide the basis for the activities outlined in this work plan.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号