首页> 美国政府科技报告 >Manager's Tool for Integrated Cost, Schedule and Technical Performance Management.
【24h】

Manager's Tool for Integrated Cost, Schedule and Technical Performance Management.

机译:经理的综合成本,进度和技术绩效管理工具。

获取原文

摘要

Partial Contents: Reengineering EVMS , A Vision, Earned Value Management: Implementation Problems, Lesson of the A-12, The Need for Change: C/ SCSC never had a chance, Unnecessary Cost, C&K.TASC Cost Drivers; Cost without a requirement, Good idea, bad implementation, The paradigm must change, Services and industry Challenged Implement 'Model Program', The Acquisition Executives Take Charge, Key Building Blocks, Work Breakdown Structure The Key to Integration, The Control Account: Where the Action is, Reengineering EVM: integrated Baseline Review.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号