首页> 美国政府科技报告 >Model Study of Marmet Lock Filling and Emptying System, Kanawha River, West Virginia
【24h】

Model Study of Marmet Lock Filling and Emptying System, Kanawha River, West Virginia

机译:西弗吉尼亚州Kanawha河marmet锁灌装系统模型研究

获取原文

摘要

This report documents the laboratory model investigation of the lock filling and emptying system for lock addition planned for the Marmet Navigation Project. This project is located on the Kanawha River in the U.S. Army Engineer District, Huntington. The filling and emptying system consists of an innovative through-the-sill intake and in-chamber longitudinal culverts. This system is less expensive than the conventional side port filling and emptying system. The model results revealed that the flow conditions in the upper approach during filling operations could be improved by lowering the upstream maintenance sill and streamlining the approach to the intakes. The original design filling and emptying system was found to perform satisfactorily for the design lift of 7.315 m (24 ft) and a 4-min valve operation. No excessive surface turbulence occurred in the chamber, and the maximum hawser forces experienced by a three- by four- barge arrangement moored inside the chamber were considered acceptable. No changes were made to the discharge outlet design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号