首页> 美国政府科技报告 >Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base.
【24h】

Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base.

机译:针对Kirtland空军基地综合自然资源管理计划的实施的最终环境评估。

获取原文

摘要

The U.S. Air Force (USAF) has recently updated the Integrated Natural Resources Management Plan (INRMP) for Kirtland Air Force Base (AFB). The INRMP provides natural resources management strategies for Kirtland AFB. The USAF prepared the Environmental Assessment (EA) to identify and evaluate potential environmental impacts of implementing the updated INRMP at Kirtland AFB. The EA was prepared in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA) (42 United States Code U.S.C. 4321- 4347), as amended, and the Council on Environmental Quality's (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations Parts 1500-1508). The INRMP is consistent with the Sikes Act Improvement Act of 1997 (SAIA), as amended through 2010 (16 U.S.C. 670a et seq.), which requires the preparation, implementation, update, and review of an INRMP for each military installation in the United States and its territories with significant natural resources. Based on the analysis contained in the Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base, which is herewith incorporated by reference, the USAF has determined that the Proposed Action has the potential to result in less than significant adverse environmental impacts.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号