首页> 美国政府科技报告 >Long-Term Ground-Water Monitoring Program and Performance - Evaluation Plan for the Extraction System at the Former Nike Missile Battery Site, Aberdeen Proving Ground, Maryland
【24h】

Long-Term Ground-Water Monitoring Program and Performance - Evaluation Plan for the Extraction System at the Former Nike Missile Battery Site, Aberdeen Proving Ground, Maryland

机译:长期地下水监测计划和性能 - 马里兰州阿伯丁试验场前耐克导弹炮场的提取系统评估计划

获取原文

摘要

This report presents a long-term ground-water monitoring program and ground-water extraction system performance monitoring and evaluation program developed by the U.S. Geological Survey during 1999-2000 in support of the remedial action conducted at the Former Nike Missile Battery Site (Nike Site), Edgewood Area, Aberdeen Proving Ground, Maryland. Concentrations of trichloroethene at the Nike Site ranged from below the Maximum Contaminant Level of 5 micrograms per liter to 299 micrograms per liter during the Remedial Investigation under the Comprehensive Environmental Response, Compensation, and Liability Act program. The long-term monitoring program utilizes six selected monitoring wells that surround a trichloroethene contaminant plume. These wells will be monitored for five years and then reviewed by Federal and State regulators to determine whether future monitoring will be required. The performance assessment plan was formulated from existing data and interpretations provided by the Remedial Investigation/Feasibility Study process and the 100% Remedial Design of the extractiontreatment system. A performance evaluation of the Nike Site extraction system partially fulfills the remedial action requirement to monitor ground water as stipulated in the September 1996 Record of Decision.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号