首页> 美国政府科技报告 >New McAlpine Lock Flling and Emptying System, Ohio River, Kentucky Hydraulic Model Investigation
【24h】

New McAlpine Lock Flling and Emptying System, Ohio River, Kentucky Hydraulic Model Investigation

机译:新的mcalpine Lock Flling and Emptying system,俄亥俄河,肯塔基州水力模型调查

获取原文

摘要

Navigation improvements at McAlpine Locks and Dam on the Ohio River include construction of another 365.76-m-(1,200-fl-) long lock chamber adjacent to the existing lock chamber. A previous model investigation of an in-chamber longitudinal culvert filling and emptying system (ILCS) with through-the-sill intakes and outlets revealed the ILCS design was feasible. The intake and outlet designs were changed and another model study, reported herein, was conducted to evaluate the hydraulic performance of the new design. The ILCS design was modified slightly from the previous study. Port extensions were added to some of the ports in the lower half of the chamber and the width of the wall baffle was increased. The filling time for acceptable chamber performance with these changes and the design lift, 11.28 m (37 ft), was 11.3 min. This filling time was achieved with a variable speed valve operation. A roof extension placed over the right intake was found to be beneficial in helping to reduce the strength of vortices that formed in the upper approach during filling operations.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号