首页> 美国政府科技报告 >Addendum to the Intrinsic Remediation Engineering Evaluation/Cost Analysis (EE/CA) for the Former AGE Fueling Facility Site.
【24h】

Addendum to the Intrinsic Remediation Engineering Evaluation/Cost Analysis (EE/CA) for the Former AGE Fueling Facility Site.

机译:前aGE加油设施场地的内在修复工程评估/成本分析(EE / Ca)补遗。

获取原文

摘要

This report presents the results of an addendum to the Intrinsic Remediation Engineering Evaluation/Cost Analysis (EE/CA) for the Former Aerospace Ground Equipment (AGE) Fueling Facility Site performed by Parsons Engineering Science (Parsons ES) at Seymour-Johnson Air Force Base (AFB), North Carolina (Parsons ES, 1996). The EE/CA was conducted to evaluate the use of intrinsic remediation with long-term monitoring (LTM) to address fuel- hydrocarbon-contaminated groundwater at the AGE Site. This addendum to the EE/CA summarizes the results of a groundwater sampling event conducted in April 2001 by the United States Environmental Protection Agency (US EPA) National Risk Management Research Laboratory (NRMRL) Subsurface Protection Division and Parsons ES. Results of this sampling event are used to evaluate spatial and temporal trends of groundwater contaminants at the AGE Site.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号