首页> 美国政府科技报告 >Operation GREENHOUSE. Scientific Director's Report Annex 9.2 Sandia Corporation Proving Ground Group. Part 2 - Mechanical Assembly. Nuclear Explosions 1951, Sanitized Version
【24h】

Operation GREENHOUSE. Scientific Director's Report Annex 9.2 Sandia Corporation Proving Ground Group. Part 2 - Mechanical Assembly. Nuclear Explosions 1951, Sanitized Version

机译:温室运营。科学主任报告附件9.2桑迪亚公司试验场组。第2部分 - 机械装配。核爆炸1951年,消毒版

获取原文

摘要

The activities of the Mechanical Assembly Unit, TU 3.1.4.2, are summarized in this report. This group prepared the experimental nuclear weapons and delivered them to a predetermined zero point, which was the focal point for all the instrumentation involved in Operation Greenhouse. The Rear Area portion of this report is essentially concerned with group organization, supply, and training. The Forward Area operations discuss the actual assembly work aboard the laboratory ship, USS Curtiss (AV-4), the weapon delivery to the zero towers, and final positioning and assembly in the tower cabs. The report includes, in Sec. 3.3.2 and Appendix A, bomb assembly and delivery schedules and sample check sheets comprising a weapons technical inspection data book (also known as 'bomb book') and a shipping manifest listing tools, equipment, and supplies.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号