首页> 美国政府科技报告 >Military Airframe Acquisition Costs. The Effects of Lean Manufacturing
【24h】

Military Airframe Acquisition Costs. The Effects of Lean Manufacturing

机译:军用机身采购成本。精益生产的影响

获取原文

摘要

This report is part of a project responding to a call by the U.S. Air Force to update cost estimating methodologies for new weapons systems-in particular, fighter aircraft. The Air Force was concerned that Cost Estimating Relationships (CERs) based on older aircraft did not adequately reflect the acquisition and manufacturing environment within which a new fighter, such as the Joint Strike Fighter (JSF) would be produced. This report is one of a series, all of which address some aspect of how to incorporate the new DoD acquisition and manufacturing environments into historical cost estimating relationships or methodologies (See Younossi, Graser, and Kennedy, 2001; Lorell and Graser, 2001). Using the CER methodology for example, the cost of a future aircraft is estimated as a function of its physical or characteristics or other program variables, using a series of equations wherein the performance and program variables are inputs, and cost or labor hours are the outputs. To create these equations, actual costs (or labor hours) to produce previous aircraft are collected and used as the dependent variables in statistical regression analysis. Explanatory variables typically include such factors as cumulative production quantity, annual production rate, such aircraft characteristics as weight and speed, and others. The resulting equations are referred to as 'cost estimating relationships', or CERs. Obviously, the ability of these equations to forecast future systems costs hinges on how well past performance is a predictor of the future.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号