首页> 美国政府科技报告 >Field Pilot Study of In Situ Capping of Palos Verdes Shelf Contaminated Sediments
【24h】

Field Pilot Study of In Situ Capping of Palos Verdes Shelf Contaminated Sediments

机译:palos Verdes shelf污染沉积物原位覆盖的野外试验研究

获取原文

摘要

Sediments covering approximately 40 sq km of the ocean floor at the Palos Verdes Shelf, near Los Angeles, CA, are contaminated with DDT and PCB. The U.S. Army Corps of Engineers (USACE), working in support of the U.S. Environmental Protection Agency (EPA), has conducted studies investigating the feasibility of in situ capping all or a portion of the site with a layer of clean sandy dredged material. A feasibility study was conducted to determine the feasibility and effectiveness of in-situ capping. This study included the necessary engineering and environmental analyses such as preliminary cap designs, operations plans, and monitoring and management plans for a range of in-situ capping options. The USACE has also recently completed a field pilot study at this site. The pilot study involved placement of approximately 103,000 cu m of capping sediments using a split-hull hopper dredge. Three 1 8-ha capping cells situated at water depths between 40 and 70 m were capped using both conventional placement methods and special spreading methods. A large-scale environmental monitoring effort was conducted before, during, and after cap placement using a number of state-of-the-art techniques and specialized equipment. Predictive modeling was also conducted during and following the placements to guide field operations and refine data for design purposes. This report provides a description of the project setting and conditions and summarizes the results of the feasibility and field pilot studies.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号