首页> 美国政府科技报告 >Navigation Conditions in Lower Lock Approach of Ice Harbor Lock and Dam, Snake River, Washington
【24h】

Navigation Conditions in Lower Lock Approach of Ice Harbor Lock and Dam, Snake River, Washington

机译:华盛顿州斯内克河冰港锁水坝下闸门导航条件

获取原文

摘要

Possible construction of facilities to improve passage of juvenile and adult migratory fish at Ice Harbor Lock and Dam on the Snake River, Washington, caused concern over the impacts to navigation especially in the lower lock approach. A 1:55-scale physical model of the project was used to help identify these impacts. Navigation conditions in the lower lock approach were determined for various discharges and barge configurations of rock dikes placed in the lower lock approach. The study revealed that the installation flow deflectors at Ice Harbor Dam caused adverse impacts to navigation in the lower lock approach. An intense eddy formed near the downstream guard wall, and the angle magnitude of the crosscurrent in the lower lock approach were larger than those with the no-deflector conditions. Several alternatives included the placement of four, 40-ft-diam circular cells, 120-ft on center, located downstream, parallel, and riverward of the lower guard wall.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号