首页> 美国政府科技报告 >Environmental Assessment, Demolish/Re-construct Pelican Pier and Seawall, MacDill AFB, Florida.
【24h】

Environmental Assessment, Demolish/Re-construct Pelican Pier and Seawall, MacDill AFB, Florida.

机译:环境评估,拆除/重建pelican码头和海堤,macDill空军基地,佛罗里达州。

获取原文

摘要

Pursuant to the President's Council on Environmental Quality (CEQ) regulations, Title 40 Code of Federal Regulations (CFR) Parts 1500-1508, as they implement the requirements of the National Environment Policy Act (NEPA) of 1969,42 U.S.C. 4321, et seq., and the Air Force Instruction, Environmental Impact Analysis Process, as promulgated at 32 CFR Part 989, the U.S. Air Force conducted an assessment of the potential environmental consequences associated with implementation of the following proposed action: to demolish the existing pier and construct a new pier and seawall in its place. The environmental assessment considered all potential impacts of the proposed action and alternatives, both as solitary actions and in conjunction with other proposed activities. The Finding of No Significant Impact (FONSI) summarizes the results of the evaluation of the proposed action and alternatives. The discussion focuses on activities that have the potential to change both the natural and human environments. The Finding of No Practicable Alternative (FONP A) summarizes the options considered and why the proposed pier and seawall was designed and sited as proposed.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号