首页> 美国政府科技报告 >Rapid Wall-Breaching Kit, Ingress Hole Determination Experiment
【24h】

Rapid Wall-Breaching Kit, Ingress Hole Determination Experiment

机译:快速墙壁破裂套件,入口孔测定实验

获取原文

摘要

The Human Research and Engineering Directorate of the U.S. Army Research Laboratory conducted an experiment to determine what size breaching hole is necessary for a soldier with a fighting load to enter a building in a tactical and timely manner. The results from this experiment were used to determine requirements for wall breaching technology. The experiment was conducted at McKenna Military Operations in Urban Terrain (MOUT) site Ft. Benning, Georgia. Soldiers from the Ranger Training Brigade and Headquarters Company 3/11th Infantry participated in the experiment. The soldiers were divided into infantry squads and participated in an exercise that involved crossing a danger area, entering a building through the three different size holes, and clearing the initial room. After participating in each mission, the soldiers were given a questionnaire to solicit information about their capabilities and limitations to enter the building. Each event was also timed to determine a mean time for entry with each hole.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号