首页> 美国政府科技报告 >Reconnaissance Study: Rouge River Watershed, Michigan Flood Hazard Reduction, Riverine Ecosystem Restoration, and Recreational Development.
【24h】

Reconnaissance Study: Rouge River Watershed, Michigan Flood Hazard Reduction, Riverine Ecosystem Restoration, and Recreational Development.

机译:侦察研究:胭脂河流域,密歇根洪水灾害减少,河流生态系统恢复和休闲发展。

获取原文

摘要

The Rouge River is located in southeast Michigan, primarily within the metropolitan Detroit area. Its watershed encompasses 48 communities and portions of 3 counties: Oakland, Washtenaw, and Wayne. The river extends 127 miles and drains approximately 467 square miles of the most densely populated urbanized land in the State of Michigan. Congress (Energy and Water Development Appropriations Bill, 2002) has directed that a basin wide watershed management study be undertaken to address flood hazard reduction, riverine ecosystem, and recreation needs. Local, county and state agencies have made significant accomplishments in restoration of the watershed. The watershed has been divided into seven (7) subwatersheds. The communities within each subwatershed formed an advisory group, which completed subwatershed management plans in 2001. The plans identified current river conditions, proposed goals, developed management actions, and identified ways to measure progress to protect and restore the beneficial uses of the river. The purpose of this study is to evaluate the existing watershed conditions, identify problems and opportunities, formulate restoration alternatives, and determine if there is a Federal interest to participate in a cost shared project. This study will also identify any willing and able local sponsors to share in feasibility, design and construction costs for any project determined to have a Federal interest. This study has concluded that there are projects within an area of the Rouge River Watershed known as the Gateway Area, which have Federal interest. The Gateway Area has been determined to have unique problems separate from the rest of the watershed, which are related to a Corps of Engineers flood control project completed during the mid-1970 s. This report recommends more detailed evaluation in a feasibility phase for six (6) projects in the Gateway Area.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号