首页> 美国政府科技报告 >Environmental Assessment for the Construction of an Addition to USSOCOM Command and Control Facility, an Information Technology Facility, and a Permanent Parking Lot MacDill AFB, Florida.
【24h】

Environmental Assessment for the Construction of an Addition to USSOCOM Command and Control Facility, an Information Technology Facility, and a Permanent Parking Lot MacDill AFB, Florida.

机译:建设加入UssOCOm指挥和控制设施,信息技术设施和永久停车场macDill aFB,佛罗里达州的环境评估。

获取原文

摘要

This Environmental Assessment (EA) examines the potential for impacts to the environment resulting from the construction of an addition to Building 501, construction of an Information Technology (IT) Facility, and construction of permanent parking lot located within the United States Special Operations Command (USSOCOM) Plaza at MacDill Air Force Base (AFB). The project would also involve the demolition of Building 501A within the USSOCOM plaza. The location of the proposed project, the scope of the environmental review, applicable regulatory requirements and coordination, and the type of decision being made are presented in this section. The logic, scope, and organization of the Environmental Assessment (EA) are also described.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号