首页> 美国政府科技报告 >Final Environmental Assessment for the Installation of New JDAM and High Fidelity Targets for the Nevada Test and Training Range
【24h】

Final Environmental Assessment for the Installation of New JDAM and High Fidelity Targets for the Nevada Test and Training Range

机译:内华达州测试和训练范围内安装新JDam和高保真目标的最终环境评估

获取原文

摘要

The United States Air Force (Air Force), Nellis Air Force Base (AFB) proposes to construct additional High Fidelity and Joint Direct Attack Munition (JDAM) target structures and ancillary facilities at the Nevada Test and Training Range (NTTR). The proposed target structures and facilities would be located in ranges 7 1, 76, and 74 of the NTTR. Existing targets, similar to the proposed target structures, are already present in ranges 71, 76, and 74. The target structures and facilities may include JDAM targets, high fidelity urban target complex, a chemical/industrial target complex, simulated tunnel complexes, convoy targets and Tactical Ordnance Scoring System towers. The purpose of constructing and implementing High Fidelity targets at the NTTR is to fulfill the Air Force's need to train aircrews in a modem urban environment. The purpose of implementing JDAM is to use it as a Stand-off Weapon during urban warfare. One of the benefits of the JDAM weapon in an urban setting is to pinpoint ' hotspots' while minimizing collateral damage. The High Fidelity and JDAM targets would provide multiple current world scenarios that depict the types of threats and terrorist facilities that the Air Force must operate against. The need for the proposed action is to enhance the realism of the High Fidelity and JDAM target training scenarios, and train aircrews in the use of High Fidelity and JDAM weapons. The proposed action would consist of integrated, realistic targets and assets, which simulate an urban environment for aircrews at multiple locations on the North Range of the NTTR. An environmental assessment (EA) was prepared for the installation of new JDAM targets and ancillary facilities proposal on NTTR. The EA considered potential impacts of the proposed action.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号