首页> 美国政府科技报告 >Environmental Assessment for the Construction of a 138-k-V Transmission Line on Eielson AFB Property.
【24h】

Environmental Assessment for the Construction of a 138-k-V Transmission Line on Eielson AFB Property.

机译:Eielson aFB物业建设138kV输电线路的环境评估。

获取原文

摘要

Eielson is located on lands that are bordered by, and in some cases incorporate, major public infrastructure such as highways, railroads, and utility corridors. One such utility corridor is the Golden Valley Electric Association's (GVEA) 69-kV power line corridor that runs from its North Pole Power Generating Plant (NPPGP) in North Pole, Alaska to the Carney Substation next to Pump Station 8 of the Trans-Alaska Pipeline. Due to age and limited capacity of the transmission line, a new 138-kV line is being proposed for construction that will follow a route through Eielson land along its western border. The proposed action will result in the construction of a 138-kV electrical transmission from the NPPGP to the Carney substation 22 miles to the southeast. The corridor will be 100-feet wide and traverse approximately 8.5 miles of Eielson land. Power line towers will be a double pole design approximately 75-feet in height.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号