首页> 美国政府科技报告 >Environmental Assessment for the Proposed Construction and Operation of an Outdoor Recreation Equipment Rental Facility at Buckley Air Force Base, Colorado.
【24h】

Environmental Assessment for the Proposed Construction and Operation of an Outdoor Recreation Equipment Rental Facility at Buckley Air Force Base, Colorado.

机译:建议在科罗拉多州巴克利空军基地建造和运营一个户外娱乐设备租赁设施的环境评估。

获取原文

摘要

In order to meet the requirements of Air Force Instruction (AFI) 34- 262, Service Programs and Use and Eligibility, and AFI 34-110, Air Force Outdoor Recreation Programs, BAFB must maintain a properly sized and functioning outdoor recreation facility. This facility would include equipment rental and non-appropriated funds (NAF) central storage, which is needed at BAFB to allow military personnel to take advantage of the many outdoor recreation opportunities available in Colorado. Outdoor recreation activities such as biking, hiking, trail running, backpacking, skiing, and others are rapidly becoming the most popular way for military personnel and their families to maintain a high level of fitness and cardiovascular health, which can meet portions of the requirements of AFI 40-501, Air Force Fitness Program. Currently, outdoor recreation equipment rental services are located in multiple temporary facilities on BAFB with no central customer service point. This makes it difficult for military personnel, their dependents, and retirees to find the equipment they would like to loan or rent. Additionally, the current lack of storage space for rental recreation equipment places severe limits on the types of equipment that can be made available to military action include (1) the no action alternative, (2) the construction and operation of an outdoor recreation equipment rental facility adjacent to Building 1005 (Alternative 1), (3) adaptive reuse of an existing facility (Alternative 2), (4) locating the outdoor recreation equipment rental facility off-base (Alternative 3), (5) locating the outdoor recreation equipment rental facility near the Main Gate (Alternative 4), or (6) locating the outdoor recreation rental facility near Williams Lake (Alternative 5). This EA has been prepared in accordance with the National Environmental Policy Act to analyze the potential environmental consequences of constructing and operating an outdoor recreation facility at BAFB.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号