首页> 美国政府科技报告 >Performance Based Logistics (PBL) for the FA-18/S-3/P-3/C-2 Auxiliary Power Unit (APU) at Honeywell; An Applied Analysis
【24h】

Performance Based Logistics (PBL) for the FA-18/S-3/P-3/C-2 Auxiliary Power Unit (APU) at Honeywell; An Applied Analysis

机译:霍尼韦尔Fa-18 / s-3 / p-3 / C-2辅助动力装置(apU)的基于性能的后勤(pBL);应用分析

获取原文

摘要

The purpose of this MBA project is to evaluate and assess the metrics, incentives and other terms and conditions of the Performance Based Logistics (PBL) contract between Naval Aviation Inventory Control Point (NAVICP) and Honeywell in support of FA-18/S-3/P-3/C-2 Auxiliary Power Unit (APU) to determine if the contractual terms and conditions established are effective in facilitating and encouraging the full potential of PBL savings and improved performance. PBL is an acquisition reform initiative intended to improve weapon system logistics with the goals of: (1) compressing the supply chain, (2) eliminating non-value added steps, (3) reducing total ownership costs, (4) improving weapon system readiness and reliability, and (5) reducing logistics footprint. An additional element of PBL is gain sharing, which ensures the contractor's profit and the government's increased performance at a reduced cost. Based on the elements of PBL, the objectives of this project include; (1) comparing the actions/activities/accomplishments of the contract to the goals of PBL, (2) measure and appraise the attainment of those goals (3) provide information about the major factors causing the observed effects on the above, and (4) identify and analyze the metrics and incentives for their effectiveness in achieving the desired outcomes. In meeting the objectives of this report, our findings indicate that non-value added steps were eliminated, and there were potential reductions in the logistics footprint. On the other hand, the supply chain was not compressed; aircraft maintenance costs did not decrease; and more importantly, the APU reliability for the FA-18, S-3, and C-2 did not improve. Our research also determined that the reliability metric was inappropriate for measuring and tracking APU reliability improvements. Our report provides recommendations specific to the APU TLS contract and other recommendations for other PBL applications.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号