First Step Towards Zero Down Time: The Creation of Synergy Through Equipment Acquisition within the Constraints of a Small Budget in an Army with Civilian Oversight - A Case of the Botswana Defence Force (BDF)

机译:走向零停滞的第一步:在民间监督的军队小预算制约因素内通过装备获取创造协同效应 - 以博茨瓦纳国防军(BDF)为例

获取原文

摘要

This thesis seeks to explore the satisfaction levels for variables that should be considered when procuring equipment in the BDF. It is believed that this investigation should lead to a statistical model specific to the BDF's procurement methods. New methods of acquisition are now demanded by the PPADB; hence new metrics have to be applied to strike an accord with the new requirements of buying for government. The null hypothesis, Ho, for this thesis is that: Downtime or turnaround time (TAT) cannot be reduced by favorable independent variables. This follows from the preliminary conclusion that there is substantial downtime as at present. It postulates that something can be done to ameliorate past mishaps. The null hypothesis therefore assumes that this will continue to prevail no matter what is done. The alternative hypothesis, Ha, is that: TAT can be reduced by favorable independent variables. The results show substantial dissatisfaction with the procurement methods of the BDF. Further research is recommended in the light of the weakness of the resultant regression model, which gave R2 = 29%.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号