首页> 美国政府科技报告 >Behind the Scenes of an Air ASW Mission.
【24h】

Behind the Scenes of an Air ASW Mission.

机译:在空中asW任务的幕后。

获取原文

摘要

Although its primary mission is air Antisubmarine Warfare (ASW), the U.S. Navy s P-3 Orion is often an integral part of a sea test or data acquisition exercise. As such, the aircraft often operates in conjunction with surface ships and submarines; and therefore, scheduling becomes a crucial part of the exercise. But planned schedules are often overcome by events and by technical decisions by personnel in charge, and therefore change. Typically, the assumption is made that the speed of an aircraft allows it great flexibility in the rescheduling process. However, what is not well understood by many participants are the constraints on the use of the aircraft which must be considered in the scheduling and planning process. This paper presents an overview of some of these constraints and describes what is involved in preparing a P-3 mission in support of an at-sea test exercise. It explains why several hours may elapse before an aircraft can be launched. It discusses aircraft and pre-flight requirements, aircrew size and qualifications, details of briefings, and real-world factors that affect missions. It is the intent of this review to provide a basic understanding of what is entailed in the preparation of a P-3 flight for an ASW field operation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号