首页> 美国政府科技报告 >North Base Industrial Area Development Plan Environmental Assessment
【24h】

North Base Industrial Area Development Plan Environmental Assessment

机译:北部基地工业区发展计划环境评估

获取原文

摘要

The Proposed Action consists of the redevelopment of the North Base Industrial Area. The redevelopment includes the construction of Auto/Skills Center, Explosive Ordnance Disposal Operations Center, and a Vehicle Maintenance Complex, a new Hazardous Waste Storage Facility and an Outdoor Recreational Center with recreational vehicle storage area. Four existing buildings (1329, 1330, 1331 and 1332) would be demolished as part of the redevelopment proposal. The entrance into Durand Loop will be modified to allow expansion into the area between Durand Loop and Lee Road. Additional recreational vehicle parking would be constructed in the undeveloped area at the south comer outside Durand Loop. Existing facilities (Buildings 1346 and 1352) within the North Base Industrial Area would remain. Nine resource categories received thorough evaluation to identify potential environmental consequences. As indicated Chapter 4.0, none of the alternatives considered would result in significant impacts to any resource category analyzed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号