首页> 美国政府科技报告 >Houston-Galveston Navigation Channels, Texas Project: Navigation Channel Sedimentation Study, Phase 1
【24h】

Houston-Galveston Navigation Channels, Texas Project: Navigation Channel Sedimentation Study, Phase 1

机译:德克萨斯州休斯顿 - 加尔维斯顿导航频道项目:导航频道沉积研究,第1阶段

获取原文

摘要

The U.S. Army Engineer District, Galveston, has recently enlarged the Houston Ship Channel from a 40-ft (12.2-m) depth by 400-ft (122-m) width to a 45-ft (13.7-m) depth by 530-ft (162-m) width. Previously, a three-dimensional (3-D) numerical model study was implemented at the U.S. Army Engineer Research and Development Center's Coastal and Hydraulics Laboratory to evaluate the salinity and circulation impact of this enlargement. The enlarged channel is nearly complete. Preliminary evaluations indicate a higher than anticipated rate of deposition in the channel reach near Atkinson Island. The purpose of this investigation was to determine if this new shoaling rate was a permanent feature of this new channel or a single anomalous event. If this considerably larger deposition is a permanent condition then the planned disposal locations must be expanded. The project will determine the possible effects on sedimentation in the channel based on dredging records, field data, vessel effects, and hydrodynamic changes due to the channel's enlargement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号