首页> 美国政府科技报告 >Pipeline River Crossing. Al Fatah, Iraq
【24h】

Pipeline River Crossing. Al Fatah, Iraq

机译:管道河流穿越。伊拉克al Fatah

获取原文

摘要

We are providing this project assessment report for your information and use. We assessed the in-process construction work being performed at the Al Fatah Pipe River Crossing in Al Fatah, Iraq to determine its status and whether intended objectives will be achieved. This assessment was made to provide you and other interested parties with real-time information on a relief and reconstruction project underway and in order to enable appropriate action to be taken if warranted. The assessment team included an engineer and an auditor. We discussed the results of this project assessment with Project and Contracting Office and U.S. Army Corps of Engineers representatives who concurred with our conclusions. This report includes no recommendations that required management comments. Details are provided in the Conclusions section of this report.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号