首页> 美国政府科技报告 >Comparative Analysis of the Resources Required for Test and Evaluation on Army-Led Weapon System Programs, Based Upon Program Size and Acquisition Management Complexity
【24h】

Comparative Analysis of the Resources Required for Test and Evaluation on Army-Led Weapon System Programs, Based Upon Program Size and Acquisition Management Complexity

机译:基于程序规模和采办管理复杂性的陆军武器系统程序测试评估所需资源比较分析

获取原文

摘要

Test and Evaluation (T&E) is an integral part of every acquisition program, as such, it consumes considerable program resources. The Department of Defense (DoD) T&E program management requirements are written to meet the risk reduction needs of large acquisition programs, but do not provide the details needed to consistently scale T&E management efforts for smaller programs across DoD. This research study investigates ways that the T&E burden to programs differs based upon the Acquisition Category (ACAT), application of T&E oversight, and materiel commodity area. The primary data source for the study was each program s Test and Evaluation Master Plan (TEMP). The majority of the programs evaluated are part of the DoD Chemical Biological Defense Program (CBDP). This research effort found ACAT-based patterns in requirements definitions and ACAT-induced variability in test site usage. The study also determined that the TEMP documentation burden was similar across all ACATs, and consistently higher than Service guidance. Future studies using this analysis methodology are required to determine whether the T&E burden to CBDP programs is typical or unique within DoD.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号