Right Bank Drinking Water Treatment Plant Rehabilitation. Commander's Emergency Response Program, Ninewa Governorate, Iraq. Sustainment Assessment

机译:右岸饮用水处理厂修复。伊拉克尼尼微省指挥官紧急应对方案。维持评估

获取原文

摘要

The Office of the Special Inspector General for Iraq Reconstruction is assessing projects funded under the Commander's Emergency Response Program to provide real-time relief and reconstruction information to interested parties to enable appropriate action, when warranted. The objective of the project was to rehabilitate and upgrade the existing 182,000 cubic meters per day drinking water treatment plant, including the repair of pumps, mixers, settling tanks, pressure filters, and chlorine closing units. This project was needed to bring the residents of Mosul fresh, potable water to drink. Its secondary objective was to maximize rapid employment opportunities for local Iraqis. On 30 September 2005, a firm-fixed-fee contract of $1,714,233.43 was awarded to a local contractor. Project Assessment Objectives. The objective of this project assessment was to determine whether the project was operating at the capacity stated in the original contract. To accomplish the objective, the Special Inspector General for Iraq Reconstruction sought to determine if the project was at full capability or capacity when accepted by the United States government, when transferred to Iraqi operators, and during a site inspection. However, security conditions prevented the Special Inspector General for Iraq Reconstruction assessment team from visiting the site.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号