首页> 美国政府科技报告 >Noise and Reverberation Reduction in Post Chapel Activity Room
【24h】

Noise and Reverberation Reduction in Post Chapel Activity Room

机译:后教堂活动室的噪音和混响减少

获取原文

摘要

In the fall of 2005 the author was contacted by the Fort Rucker Post Chaplain to investigate and offer some suggestions for improving the acoustics in the chapel's activity room. Visual inspection and Sabine-model calculations led to the recommendation to install additional sound-absorbing surface area. In January 2006, the Fort Rucker Directorate of Public Works presented a contractor's proposal to add 700 square feet of absorbing baffles suspended from the ceiling. This plan was later changed to include an additional 1000 square feet of absorbing wall panel to the already existing wall-mounted paneling. This report contains results of reverberation time measurements, made before and after installation of the additional paneling. It shows that the renovation was effective, reducing reverberation times at all frequencies by almost a factor of two except at the lowest measured frequency (125 Hz) where reverberation time was unaffected. It is expected that, with a carefully tuned electronic public address system, the space should now be acoustically functional for worship, conferences, theater and music performances, and social functions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号